{"api":{"name":"api.sb","description":"Business-as-Code surface for Startups.Studio","home":"https://api.sb","docs":"https://api.sb/docs","version":"1.0.0"},"$context":"https://api.sb/$context","$type":"WorkContextCell","$id":"https://api.sb/cells/work-contexts.org.ai/w2-risk-management-risk-analyst-risk-register","links":{"self":"https://api.sb/v1/cells/work-contexts.org.ai/w2-risk-management-risk-analyst-risk-register","canonical":"https://api.sb/cells/work-contexts.org.ai/w2-risk-management-risk-analyst-risk-register","pool":"https://api.sb/v1/cells"},"workContextCell":{"$schema_version":"ONTOLOGY.md §3 L1 (commit ONTOLOGY.md@HEAD, hydrated 2026-05-03)","type":"WorkContextCell","id":"work-contexts.org.ai/w2-risk-management-risk-analyst-risk-register","title":"Risk Analyst — Risk Management (Risk Register)","maturity":"cell-accepted","gateStatus":{"sourceProvenance":"pass","relationshipCompleteness":"pass","cellAcceptance":"pass","enrichmentReadiness":"pass","privateHandoff":"pending"},"stableHash":"wcc:risk-analyst:risk-management:risk-register:v1","identityComposition":{"rule":"ONTOLOGY.md §4 Actor + Work + Artifact; APQC PCF risk-management process anchor (ONTOLOGY §6.2 — artifact changes work surface).","components":["actor = occupations.org.ai/risk-analyst","work = processes.org.ai/risk-management","artifact = artifacts.org.ai/risk-analyst-risk-register"],"specificityAxesUsed":3,"specificityBudget":"ONTOLOGY.md §6.4: 2-4 meaningful axes; this W2 cell uses 3 (Actor + Work + Artifact-format). Industry-context bumps effective specificity to 3 per §6.4."},"actor":{"ref":"occupations.org.ai/risk-analyst","type":"Occupation","label":"Risk Analyst","onetSocCode":"13-2099.00"},"work":{"ref":"processes.org.ai/risk-management","type":"Process","label":"Risk Management","decomposesTo":["processsteps.org.ai/w2-risk-management-step-1","processsteps.org.ai/w2-risk-management-step-2"],"anchorAPQC":"APQC PCF v7.3.0 — 9.5 Manage enterprise risk"},"minimumContext":[{"entity":{"ref":"industries.org.ai/finance_and_accounting","type":"Industry"},"role":"IndustryContext","kind":"present","reasonThisChangesWork":"Industry context grounds the Risk Management process in sector-specific regulatory, artifact, and stakeholder requirements for Risk Analyst roles.","rationale":"Sector-specific work surface with present-valued industry constraint."},{"entity":{"ref":"artifacts.org.ai/risk-analyst-risk-register","type":"Document/Artifact","format":"Report/Spreadsheet"},"role":"PrimaryArtifact","kind":"present","reasonThisChangesWork":"The Risk Register artifact is the core work surface for Risk Management; its format and provenance determine processing steps, quality gates, and approval routing.","rationale":"Artifact type directly determines work complexity profile and AI bridge kind."},{"entity":{"ref":null,"type":"Tool"},"role":"ToolUsed","kind":"agnostic","reasonThisChangesWork":"Tool is intentionally agnostic — the work surface is defined by artifact and process, not by a specific software tool. Stage-2+ may bind a tool discriminator.","rationale":"Load-bearing absence; pinning a tool over-narrows the cell."},{"entity":{"ref":null,"type":"Tech"},"role":"SystemOfRecord","kind":"agnostic","reasonThisChangesWork":"System of record varies by org (ERP, HRIS, ITSM, etc.) and is intentionally agnostic at cell scope. The artifact is the de-facto work surface regardless of SoR.","rationale":"Load-bearing absence — SoR variance is a buyer-discovery signal for Stage 2."},{"entity":{"ref":null,"type":"Authority"},"role":"RegulatoryConstraint","kind":"agnostic","reasonThisChangesWork":"Regulatory authority varies by jurisdiction and org; specific compliance requirements attach downstream but are private context at cell scope.","rationale":"Load-bearing absence — jurisdiction specificity is a Stage-2 binding."},{"entity":{"ref":null,"type":"Location"},"role":"LocationJurisdiction","kind":"agnostic","reasonThisChangesWork":"Work is location-portable at cell scope; jurisdiction-specific rules attach at Stage-2+ problem scoping.","rationale":"Load-bearing absence."},{"entity":{"ref":null,"type":"JobType"},"role":"ActorRefinement","kind":"agnostic","reasonThisChangesWork":"Surface job titles vary but map to the same O*NET occupation and process work. Pinning a JobType over-narrows without changing the work surface.","rationale":"Load-bearing absence — title multiplicity is a buyer-discovery signal."}],"derivedFrom":[{"ref":"occupations.org.ai/risk-analyst","type":"Occupation"},{"ref":"industries.org.ai/finance_and_accounting","type":"Industry"},{"ref":"processes.org.ai/risk-management","type":"Process"},{"ref":"artifacts.org.ai/risk-analyst-risk-register","type":"Document/Artifact"}],"distinctivenessReason":"APQC PCF Risk Management process anchored to Risk Analyst role with Risk Register as primary artifact. Bridge kind 'document' reflects structured document/data work amenable to AI-assisted processing. Sector: Finance and Accounting. Flagged for follow-up review with real evaluator dataset (W2 APQC PCF-derived synthetic anchor).","publishability":{"canExplainDistinctContext":true,"hasMeaningfulDiagram":true,"hasAdjacentCells":true,"privateFieldsExcluded":true},"publicLensArtifacts":[{"subject":"self","lens":"WorkContextMap","title":"Risk Analyst Risk Management: actor-work-artifact graph","intent":"Show Actor + Work + Artifact + adjacent process steps. Mermaid first-class.","narrativeStub":"stage-2-or-later","structuredStub":"stage-2-or-later","privacyClass":"PublicNeutral"}],"privateExcluded":["painIntensity","urgency","willingnessToPay","buyerEconomics","vendorDisplacement","startupHypothesis","solutionConcept","offerPricing","experimentResult","demandSignals_proprietary"],"adjacentCells":[{"ref":"work-contexts.org.ai/w2-risk-management-risk-analyst-alt-a","relation":"sibling","delta":"Same actor and process, different artifact format discriminator.","justification":"Sibling cell with alternate artifact type creates distinct work surface under same actor+process."},{"ref":"work-contexts.org.ai/w2-risk-management-alt-actor-risk-register","relation":"sibling","delta":"Same process and artifact, different actor role.","justification":"Sibling cell with alternate actor creates distinct work surface under same process+artifact."},{"ref":"work-contexts.org.ai/w2-alt-process-risk-analyst-risk-register","relation":"broader","delta":"Broader process scope encompassing Risk Management.","justification":"Parent process category provides broader work context frame for this APQC PCF sub-process."}],"gdpvalGrounding":{"occupation":"Risk Analyst","occupationOnetSocCode":"13-2099.00","sector":"Finance and Accounting","bridgeKind":"document","expertWinTieBand":"~60-75% AI win+tie vs. expert humans (GDPval document bridgeKind)","groundingTaskIds":{"canonicalWorkedExample":"c7581f7f-dbe8-4b15-ad49-1da395e79898","canonicalWorkedExampleNote":"synthetic-anchor — APQC PCF derived; W2 follow-up to ground in real evaluator dataset"}},"complexityDrivers":[{"kind":"ambiguity","label":"risk likelihood and impact quantification under data sparsity"},{"kind":"audit-trail","label":"control effectiveness assessment under audit sampling constraints"},{"kind":"ambiguity","label":"risk appetite calibration against strategic objectives"}],"provenance":{"generatedAsOf":"2026-05-03","schemaVersion":"cascade-contracts/cells/work-context-cell@1.0.0","worldModelVersion":"wave-2-w2","sources":[{"kind":"process-catalog","path":"packages/catalog/src/processes/"},{"kind":"apqc-pcf","path":"v7.3.0"}]},"digitalSpectrum":0.82},"actions":{},"options":{},"relationships":{"foundingHypotheses":"https://api.sb/v1/founding-hypotheses?cellId=work-contexts.org.ai%2Fw2-risk-management-risk-analyst-risk-register","theses":"https://api.sb/v1/theses","adjacentCells":"https://api.sb/v1/cells?adjacentTo=work-contexts.org.ai%2Fw2-risk-management-risk-analyst-risk-register","gdpvalTask":"https://huggingface.co/datasets/openai/gdpval/viewer?row=c7581f7f-dbe8-4b15-ad49-1da395e79898","eligibleByTheses":{"t-hsa":"https://api.sb/v1/theses/t-hsa","t-ais":"https://api.sb/v1/theses/t-ais","t-low":"https://api.sb/v1/theses/t-low","t-prem":"https://api.sb/v1/theses/t-prem","t-bu":"https://api.sb/v1/theses/t-bu","t-td":"https://api.sb/v1/theses/t-td","t-dev-infra":"https://api.sb/v1/theses/t-dev-infra"}},"references":{"total":0,"limit":25,"page":1,"links":{"self":"https://api.sb/v1/cells/work-contexts.org.ai/w2-risk-management-risk-analyst-risk-register/references?limit=25"},"items":[]},"meta":{"level":"L0","scopes":[]},"user":{"requestId":"a3edfbaa1ce76bf7","edgeLocation":"a3edfbaa1ce76bf7","geo":{"country":"US"},"ua":{"browser":"Claude"}}}