{"api":{"name":"api.sb","description":"Business-as-Code surface for Startups.Studio","home":"https://api.sb","docs":"https://api.sb/docs","version":"1.0.0"},"$context":"https://api.sb/$context","$type":"FoundingHypothesis","$id":"https://api.sb/founding-hypotheses/fh%3Amechanical-engineers-change-order-impact-assessment%3At-ais-prem%3Av1","links":{"self":"https://api.sb/v1/founding-hypotheses/fh%3Amechanical-engineers-change-order-impact-assessment%3At-ais-prem%3Av1","canonical":"https://api.sb/founding-hypotheses/fh%3Amechanical-engineers-change-order-impact-assessment%3At-ais-prem%3Av1","pool":"https://api.sb/v1/founding-hypotheses"},"foundingHypothesis":{"id":"fh:mechanical-engineers-change-order-impact-assessment:t-ais-prem:v1","lens":"ManagedWorkflow","type":"founding-hypothesis","click":{"rubricScores":{"C8_lensFit":1,"C7_magicLensFit":1,"C4_competitorHonesty":1,"C6_crossSlotCoherence":1,"C1_customerSpecificity":1,"C2_problemFrictionRealism":1,"C9_killCriteriaAttestability":1,"C3_approachEngineCoverability":1,"C5_differentiationLoservilleEscape":1},"upperRightLoserville":true},"cellRef":{"id":"work-contexts.org.ai/mechanical-engineers-change-order-impact-assessment","stableHash":"wcc:mechanical-engineers:change-order-impact-assessment:document:v1"},"problem":{"slotStatement":"When a substation ECO gets approved, the lead mechanical engineer cannot reconstruct six months later which load-flow study, which vendor datasheet revision, and which NESC clearance memo actually justified the decision — the provenance chain between the signed ECO, the upstream studies, and the as-built redlines breaks across email, SharePoint, and the EAM, leaving the co-op exposed when RUS auditors or PUC staff ask who approved the cost impact and on what evidence."},"approach":{"oneSentence":"ECO-binder workflow that walks each change order from origination through PE-stamped approval while stitching every cost, schedule, and clearance delta to the specific load-flow run, vendor datasheet revision, and NESC/IEEE memo that justified it — producing a single reviewer-facing packet the VP Engineering can hand to RUS or PUC staff without a six-week reconstruction sprint."},"customer":{"icpShape":"VP of Engineering (economic buyer who signs the tooling PO) at a member-owned electric cooperative (CompanyType/company-type-member-owned-electric-cooperative) in the 80k-300k meter range running a mechanical/substation engineering group of 8-25 licensed PEs, where the buyer is the VP of Engineering and the daily user is the lead mechanical engineer who owns ECO impact assessments on substation, SCADA-enclosure, and transformer-pad change orders.","beachheadShape":"EarlyMajorityWorkflow: G&T-affiliated distribution co-ops under active RUS/USDA loan covenants whose substation ECOs trigger PUC rate-base justification within 90 days."},"archetype":"startup-archetypes.org.ai/ManagedWorkflow-OutcomeBased","beachhead":"EarlyMajorityWorkflow: G&T-affiliated distribution co-ops under active RUS/USDA loan covenants whose substation ECOs trigger PUC rate-base justification within 90 days.","competitors":{"substitutes":[{"name":"Bookkeeper's Stripe-payout VLOOKUP sheet (and the ECO equivalent: engineer-maintained Excel impact log)","category":"manual-bridge"},{"name":"Email + SharePoint + Outlook approval threads","category":"informal"},{"name":"Oracle Primavera Unifier (ECO / change-management module)","category":"incumbent","uncopyabilityReason":"Unifier's change-management module is a configurable form-and-workflow engine priced and sold on an implementation-services model; binding a specific load-flow CYME run or a vendor datasheet revision to an ECO requires Oracle to build co-op-specific connectors to CYME/ETAP/Milsoft and an NESC clearance evaluator — integration depth their SI channel is not staffed to deliver, and doing so would cannibalize the multi-year Unifier configuration services revenue."},{"name":"Bentley ProjectWise (with OpenUtilities Substation)","category":"incumbent","uncopyabilityReason":"ProjectWise is a CAD/document-management substrate tuned for drawing versioning; it lacks the vertical data corpus of co-op-specific ECO decision patterns (RUS Form 740c cost categories, G&T wheeling-rate implications, PUC rate-base memos) needed to auto-assemble a defensible impact packet, and Bentley's licensing model is seat-based CAD, not a per-ECO engineering-decision service."},{"name":"AuditBoard (used by co-op internal audit for RUS compliance)","category":"adjacent vertical","uncopyabilityReason":"AuditBoard's deployment mode is a GRC control-testing platform aimed at the internal-audit function, not the engineering function — it sits downstream of the ECO decision and has no native hooks into load-flow tools, PE-stamp workflow, or the substation EAM, so it can only import ECO evidence after the fact rather than generate it at decision time."}]},"studioThesis":"T-AIS-PREM","killThreshold":{"K":8,"M":70,"N":7,"rubricItemSet":["C1_customerSpecificity","C2_problemFrictionRealism","C3_approachEngineCoverability","C4_competitorHonesty","C5_differentiationLoservilleEscape","C6_crossSlotCoherence","C7_magicLensFit","C8_lensFit","C9_killCriteriaAttestability"],"verdictPolicy":"all-load-bearing-pass-and-overall-ge-X","loadBearingItemSet":["C1_customerSpecificity","C2_problemFrictionRealism","C3_approachEngineCoverability","C4_competitorHonesty","C5_differentiationLoservilleEscape","C6_crossSlotCoherence","C9_killCriteriaAttestability"],"verdictPolicyVerbatim":"KILL unless every load-bearing rubric item passes per workbook AND overall pass-rate ≥ 7/9 (CASCADE.md §4 Stage 9 commit threshold)."},"lifecycleState":"Active","differentiation":{"twoByTwo":{"xAxis":"Integration depth with engineering-decision tools (document-management only ↔ native hooks into CYME/ETAP load-flow runs, vendor datasheet PLM, and the Maximo/Cascade EAM)","yAxis":"Authority boundary (advisory draft the PE rewrites ↔ PE-stamp-ready impact packet bound to the licensed engineer's seal workflow)","winningQuadrant":"Native load-flow / datasheet / EAM hooks feeding a PE-stamp-ready impact packet the licensed mechanical engineer signs in one pass","loservilleEscape":true,"loservilleQuadrant":"Document-management-only tools (ProjectWise-style) producing advisory drafts the PE has to rebuild from scratch before stamping, which is exactly the state co-ops hit when Unifier's generic change forms collect attachments without binding them to the CYME run that justified the decision"}},"unmetRequirements":[],"pricingArchitecture":"usage-meter"},"actions":{},"options":{},"relationships":{"runtimeUnit":"https://api.sb/v1/runtime-units?startupRef=startup%3Afh%3Amechanical-engineers-change-order-impact-assessment%3At-ais-prem%3Av1","brand":"https://api.sb/v1/brands?startupId=startup%3Afh%3Amechanical-engineers-change-order-impact-assessment%3At-ais-prem%3Av1","listing":"https://api.services/listings?foundingHypothesisRef=fh%3Amechanical-engineers-change-order-impact-assessment%3At-ais-prem%3Av1","cell":"https://api.sb/v1/cells/work-contexts.org.ai/mechanical-engineers-change-order-impact-assessment","thesis":"https://api.sb/v1/theses/T-AIS-PREM"},"meta":{"level":"L0","scopes":[]},"user":{"requestId":"a0575ba2aa1ca8fe","edgeLocation":"a0575ba2aa1ca8fe","geo":{"country":"US"},"ua":{"browser":"Claude"}},"references":{"total":0,"limit":25,"page":1,"links":{"self":"https://api.sb/v1/founding-hypotheses/fh%3Amechanical-engineers-change-order-impact-assessment%3At-ais-prem%3Av1/references"},"items":[]}}