{"api":{"name":"api.sb","description":"Business-as-Code surface for Startups.Studio","home":"https://api.sb","docs":"https://api.sb/docs","version":"1.0.0"},"$context":"https://api.sb/$context","$type":"FoundingHypothesis","$id":"https://api.sb/founding-hypotheses/fh%3Aproducers-and-directors-production-schedule-coordination%3At-td%3Av1","links":{"self":"https://api.sb/v1/founding-hypotheses/fh%3Aproducers-and-directors-production-schedule-coordination%3At-td%3Av1","canonical":"https://api.sb/founding-hypotheses/fh%3Aproducers-and-directors-production-schedule-coordination%3At-td%3Av1","pool":"https://api.sb/v1/founding-hypotheses"},"foundingHypothesis":{"id":"fh:producers-and-directors-production-schedule-coordination:t-td:v1","lens":"CoPilot","type":"founding-hypothesis","click":{"rubricScores":{"C8_lensFit":1,"C7_magicLensFit":1,"C4_competitorHonesty":1,"C6_crossSlotCoherence":1,"C1_customerSpecificity":1,"C2_problemFrictionRealism":1,"C9_killCriteriaAttestability":1,"C3_approachEngineCoverability":1,"C5_differentiationLoservilleEscape":1},"upperRightLoserville":true},"cellRef":{"id":"work-contexts.org.ai/producers-and-directors-production-schedule-coordination","stableHash":"wcc:producers-and-directors:production-schedule-coordination:multimodal:v1"},"problem":{"slotStatement":"Every time the co-op's safety-rules handbook, IBEW bargaining calendar, or NRECA storm-response protocol revs, the line producer re-opens the shooting schedule and discovers the call sheet still references last quarter's clearance-distance rule or the retired night-shift differential — the board-of-directors committee's quarterly handbook review never syncs to the stripboard, so crew keeps shooting against a stale version pin and two or three days of footage get reshot after safety review kicks it back."},"approach":{"oneSentence":"A shooting-schedule version-pin watcher that subscribes to the co-op's safety-handbook, IBEW MOU, and NRECA bulletin feeds, re-validates every call sheet and stripboard strip against the live rule version the day it ships, and escalates a diff-annotated review packet to the line producer whenever a stripboard strip still points at a retired rule so the crew never rolls camera on a stale clause."},"customer":{"icpShape":"Director of Production Operations at a member-owned electric cooperative (CompanyType/company-type-member-owned-electric-cooperative) that runs an in-house video/media unit producing member-communications, safety-training, and storm-response documentary shoots across 60-200 crew-days per year, where the buyer is the VP of Member Services / Communications (signs the software PO and owns the annual media budget) and the daily user is the line producer or production coordinator assembling the shooting schedule and crew call sheets.","beachheadShape":"EarlyAdopterJTBD: in-house media units at G&T and distribution electric co-ops that shoot safety-compliance and storm-recovery footage under NRECA/RUS reporting obligations and already operate a Movie Magic or StudioBinder license for scheduling."},"archetype":"startup-archetypes.org.ai/CoPilot-UsageMetered","beachhead":"EarlyAdopterJTBD: in-house media units at G&T and distribution electric co-ops that shoot safety-compliance and storm-recovery footage under NRECA/RUS reporting obligations and already operate a Movie Magic or StudioBinder license for scheduling.","competitors":{"substitutes":[{"name":"Quarterly committee handbook re-read and manual stripboard patching","category":"informal"},{"name":"Movie Magic Scheduling (Entertainment Partners)","category":"incumbent","uncopyabilityReason":"Movie Magic is a desktop-first stripboard authoring tool whose deployment model assumes the AD owns the canonical schedule file — it has no subscription ingestion path for external rule corpora (NRECA bulletins, IBEW MOU revs, co-op safety handbooks) and no server-side re-validation loop. Shipping a live rule-version watcher would require rebuilding the product as a cloud service with vertical connectors into cooperative-utility publishing systems, a deployment-mode-mismatch EP cannot execute inside six months without abandoning its installed film-industry base."},{"name":"StudioBinder production scheduling","category":"incumbent","uncopyabilityReason":"StudioBinder's corpus and template library are built around narrative film/TV and commercial-agency workflows; it has no vertical-data-corpus of electric-cooperative safety rules, RUS reporting categories, or IBEW local-by-local differentials, and no relationships with NRECA to license the bulletin feed. Recreating that vertical rule graph is a multi-year data-partnership lift, not a feature sprint."},{"name":"Airtable + Smartsheet + a shared Google Doc of current rules","category":"manual-bridge"},{"name":"Cast & Crew / Showbiz compliance add-ons","category":"AI-native horizontal","uncopyabilityReason":"Cast & Crew's compliance posture is anchored to payroll and labor-law liability (I-9, union residuals, state tax); assuming liability for whether a shooting schedule correctly pins to the current NRECA storm-response protocol would expand their liability-posture into operational-safety attestation, which their E&O carrier and payroll-bureau licensure structure do not underwrite."}]},"studioThesis":"T-TD","killThreshold":{"K":9,"M":35,"N":8,"rubricItemSet":["C1_customerSpecificity","C2_problemFrictionRealism","C3_approachEngineCoverability","C4_competitorHonesty","C5_differentiationLoservilleEscape","C6_crossSlotCoherence","C7_magicLensFit","C8_lensFit","C9_killCriteriaAttestability"],"verdictPolicy":"all-load-bearing-pass-and-overall-ge-X","loadBearingItemSet":["C1_customerSpecificity","C2_problemFrictionRealism","C3_approachEngineCoverability","C4_competitorHonesty","C5_differentiationLoservilleEscape","C6_crossSlotCoherence","C9_killCriteriaAttestability"],"verdictPolicyVerbatim":"KILL unless every load-bearing rubric item passes per workbook AND overall pass-rate ≥ 8/9 (CASCADE.md §4 Stage 9 commit threshold)."},"lifecycleState":"Active","differentiation":{"twoByTwo":{"xAxis":"Rule-version reconcile cadence (quarterly human re-read ↔ continuous feed-subscribed re-validation on every call-sheet publish)","yAxis":"Vertical rule-corpus coverage (generic film/TV production templates ↔ electric-cooperative-specific: NRECA bulletins + IBEW local MOUs + co-op safety handbook)","winningQuadrant":"Continuous re-validation against a co-op-specific rule corpus — every stripboard publish diffs against the live NRECA/IBEW/handbook version and flags stale pins before the truck rolls","loservilleEscape":true,"loservilleQuadrant":"Quarterly human handbook re-read against a generic film-production template — the pattern Movie Magic + committee-review bridge currently exhibits, where a retired clearance-distance rule survives on the call sheet for 8-12 weeks until safety review kicks back already-shot footage"}},"unmetRequirements":[],"pricingArchitecture":"single-price"},"actions":{},"options":{},"relationships":{"runtimeUnit":"https://api.sb/v1/runtime-units?startupRef=startup%3Afh%3Aproducers-and-directors-production-schedule-coordination%3At-td%3Av1","brand":"https://api.sb/v1/brands?startupId=startup%3Afh%3Aproducers-and-directors-production-schedule-coordination%3At-td%3Av1","listing":"https://api.services/listings?foundingHypothesisRef=fh%3Aproducers-and-directors-production-schedule-coordination%3At-td%3Av1","cell":"https://api.sb/v1/cells/work-contexts.org.ai/producers-and-directors-production-schedule-coordination","thesis":"https://api.sb/v1/theses/T-TD"},"meta":{"level":"L0","scopes":[]},"user":{"requestId":"a0575b946809a8fe","edgeLocation":"a0575b946809a8fe","geo":{"country":"US"},"ua":{"browser":"Claude"}},"references":{"total":0,"limit":25,"page":1,"links":{"self":"https://api.sb/v1/founding-hypotheses/fh%3Aproducers-and-directors-production-schedule-coordination%3At-td%3Av1/references"},"items":[]}}