{"api":{"name":"api.sb","description":"Business-as-Code surface for Startups.Studio","home":"https://api.sb","docs":"https://api.sb/docs","version":"1.0.0"},"$context":"https://api.sb/$context","$type":"FoundingHypothesis","$id":"https://api.sb/founding-hypotheses/fh%3Aw2-capacity-planning-supply-planner-supply-constraint%3At-dev-infra%3Av1","links":{"self":"https://api.sb/v1/founding-hypotheses/fh%3Aw2-capacity-planning-supply-planner-supply-constraint%3At-dev-infra%3Av1","canonical":"https://api.sb/founding-hypotheses/fh%3Aw2-capacity-planning-supply-planner-supply-constraint%3At-dev-infra%3Av1","pool":"https://api.sb/v1/founding-hypotheses"},"foundingHypothesis":{"id":"fh:w2-capacity-planning-supply-planner-supply-constraint:t-dev-infra:v1","lens":"AIService","type":"founding-hypothesis","click":{"rubricScores":{"C8_lensFit":0,"C7_magicLensFit":1,"C4_competitorHonesty":1,"C6_crossSlotCoherence":1,"C1_customerSpecificity":1,"C2_problemFrictionRealism":1,"C9_killCriteriaAttestability":1,"C3_approachEngineCoverability":1,"C5_differentiationLoservilleEscape":1},"upperRightLoserville":true},"cellRef":{"id":"work-contexts.org.ai/w2-capacity-planning-supply-planner-supply-constraint","stableHash":"wcc:supply-planner:capacity-planning:supply-constraint:v1"},"problem":{"slotStatement":"Supply planners spend 2–3 days a week manually triaging which customer orders to de-commit when a constrained component (MLCC, advanced-node wafer, specialty connector) under-delivers, and the allocation rationale they hand to sales and the S&OP review is a spreadsheet with no defensible trail back to contract priority, on-hand, or supplier ASN evidence."},"approach":{"oneSentence":"A capacity-allocation attestation engine that reconciles open sales orders, MRP net-requirements, and supplier ASN commits against contract-priority rules, then certifies each de-commit/expedite decision with a review-ready trace linking the action to the specific shortage, customer tier, and supplier promise-date that drove it."},"customer":{"icpShape":"North American contract electronics manufacturers ($250M–$2B revenue, 3–8 plants) where the buyer is the VP of Supply Chain who signs the planning-tools PO and the daily user is the Supply Planner running weekly capacity-constrained build plans in Kinaxis or o9","beachheadShape":"EarlyAdopterJTBD: EMS/CM supply planners firefighting silicon-allocation shortfalls during bookings-to-build reconciliation"},"archetype":"startup-archetypes.org.ai/AIService-MoneyOnDelivery","beachhead":"EarlyAdopterJTBD: EMS/CM supply planners firefighting silicon-allocation shortfalls during bookings-to-build reconciliation","competitors":{"substitutes":[{"name":"Kinaxis RapidResponse capacity scenarios","category":"incumbent"},{"name":"o9 Solutions supply planning agents","category":"incumbent"},{"name":"Planner-built Excel allocation workbooks with Power Query","category":"status-quo"},{"name":"ChatGPT Enterprise + copy-pasted BOM/MRP extracts","category":"AI-native horizontal"}]},"studioThesis":"T-DEV-INFRA","killThreshold":{"K":8,"M":30,"N":7,"rubricItemSet":["C1_customerSpecificity","C2_problemFrictionRealism","C3_approachEngineCoverability","C4_competitorHonesty","C5_differentiationLoservilleEscape","C6_crossSlotCoherence","C7_magicLensFit","C8_lensFit","C9_killCriteriaAttestability"],"verdictPolicy":"all-load-bearing-pass-and-overall-ge-X","loadBearingItemSet":["C1_customerSpecificity","C2_problemFrictionRealism","C3_approachEngineCoverability","C4_competitorHonesty","C5_differentiationLoservilleEscape","C6_crossSlotCoherence","C9_killCriteriaAttestability"],"verdictPolicyVerbatim":"KILL unless every load-bearing rubric item passes per workbook AND overall pass-rate ≥ 7/9 (CASCADE.md §4 Stage 9 commit threshold)."},"lifecycleState":"Active","differentiation":{"twoByTwo":{"xAxis":"Decision traceability (planner-reasoned spreadsheet ↔ per-line citation back to contract clause + supplier ASN evidence)","yAxis":"Planning-system embedding (external scenario sandbox ↔ writes directly into the RapidResponse/o9 allocation worksheet planners already close the week in)","winningQuadrant":"per-line cited allocation decisions written straight into the RapidResponse/o9 constrained-supply worksheet planners sign off each Friday","loservilleEscape":true,"loservilleQuadrant":"ChatGPT-style sidecar chat that reasons over pasted BOM extracts and returns prose recommendations the planner must re-key into Kinaxis with no audit trail"}},"unmetRequirements":[],"pricingArchitecture":"usage-meter"},"actions":{},"options":{},"relationships":{"runtimeUnit":"https://api.sb/v1/runtime-units?startupRef=startup%3Afh%3Aw2-capacity-planning-supply-planner-supply-constraint%3At-dev-infra%3Av1","brand":"https://api.sb/v1/brands?startupId=startup%3Afh%3Aw2-capacity-planning-supply-planner-supply-constraint%3At-dev-infra%3Av1","listing":"https://api.services/listings?foundingHypothesisRef=fh%3Aw2-capacity-planning-supply-planner-supply-constraint%3At-dev-infra%3Av1","cell":"https://api.sb/v1/cells/work-contexts.org.ai/w2-capacity-planning-supply-planner-supply-constraint","thesis":"https://api.sb/v1/theses/T-DEV-INFRA"},"meta":{"level":"L0","scopes":[]},"user":{"requestId":"a057b9955ab1a5f3","edgeLocation":"a057b9955ab1a5f3","geo":{"country":"US"},"ua":{"browser":"Claude"}},"references":{"total":0,"limit":25,"page":1,"links":{"self":"https://api.sb/v1/founding-hypotheses/fh%3Aw2-capacity-planning-supply-planner-supply-constraint%3At-dev-infra%3Av1/references"},"items":[]}}